Jeu SMED
An Easy and immediately operational Game
to Initiate your Work team to the SMED Methodology
For details and Ordering go to www.lean-shop.net
Preliminary comments:
{mosimage}
- The SMED game is firstly for small team training (4 to 6 persons).
- The SMED game is a training-action product.
- The SMED game intends to apply the competences acquired during the game by means of progress actions via a SMED site
AL-Consulting is training organism officially registered under the number N° 23-27-01156-27 (France).
Any document is on data support (PDF and PowerPoint files) directly sent to your email address as soon as your order.
Those documents are similar (and to the most recent update) than those that AL-Consulting consultants use during their SMED implementation mission at our Customers. |
The SMED game includes the following elements:
- 1 machine (represented by a support and a cramp adjustable in height, as well as an upright used as a material shop)
- 2 fixtures (symbolized by cylinders)
- 2 type of raw materials
- 1 « hand tool» set (wrenches, six sided spanners, etc.) necessary for series changes
- Various necessary accessories to implement the various progress actions (machines, tools, raw material shop improvement, ...)
- The Trainer guide book (paper and CD-ROM)
- Listing of the fixtures included in the guide book (paper and CD-ROM)
- All the necessary working documents for the animation l(original papers + CD-ROM)
- The free subscription to the Lean-Xpress newsletter
- The access to the exchange forum of AL-Consulting customer knowledge and experience
These elements are detailed in the following pages...
The trainer guide book
A complete and detailed trainer guide book with spiral binding (see extract) to help you to easily animate and explain the SMED methodology completeness. It includes:
- A preliminary
- The description of the used material
- A summary of the game process
- The game preparing: arrangement of the players and check-list of the equipment
- Preliminary introduction by the trainer
- 1st timing: Determination of the reference time
- 2nd timing : 1st progress phase change preparation and organization
- 3rd timing : 2nd progress phase technical modifications at low costs
- 4th timing : 3rd progress phase important technical modifications
- These pages are illustrated with photos
Pagination in the A5 size will allow the provision of the trainer guide-book in the form of a pocket note book for an easier consultation. |
The working sheets
The working sheets (original paper and CD-ROM) (see extract) to help you to easily animate and implement the SMED methodology completeness.
These documents will be presented by retro projector (slides) or video projection to the SMED group during the animation.
{mospagebreak title=Lean-Xpress}
The free subscription to the Lean-Xpress newsletter
Each month you will receive by mail a summary of the advices and examples of the best practices to apply the SMED and the other Lean Manufacturing tools.
You will also, if you wish, become one of our writers.